Durisol ICF


British manufactured Durisol is the simple and sustainable alternative to brick, block, and timber-frame construction and offer an easy, cost-effective and thermally efficient way to build. 

Benefits include

  • Up to 30% cheaper than traditional build
  • British manufactured
  • Minimal lead times
  • Quick and easy to construct
  • Exceeds Building Control requirements
  • U values as low as 0.15
  • BRE Green Guide A Rating
  • Acoustic performance to 63dB
  • Fireproof at 1100 degrees Centigrade
  • Low energy manufacture
  • Made from 80% recycled wood

SIPS - Super Insulated Panels

These structural panels provide a labour & material-saving alternative to the traditional timber frame or masonry construction. The insulation used in these panels is continuous and is not bridged by timber studs. This type of panel has been in use for over 50 years and they offer an energy efficient building system that substantially reduces on-site labour times &  costs.

  • High levels of Thermal Performance
  • High levels of Air Tightness
  • Low levels of waste
  • Meets 2016 building standards
  • Reduced construction costs
  • Fast on-site erection
  • Off- site manufacture

If you would like a quotation for a new build or extension, contact us for your free quotation!

Durisol ICF Extension - Scunthorpe

#ICF #insulatedconcreteform #ecobuild #extension #ecofriendlybuilding #grimsby #scunthorpe #grimsby

Day 1

The blocks start to be laid above damp. 1 operative and 1 labourer. This system is far faster than a traditional build causing far less disruption to our clients.

#ICF #insulatedconcreteform #ecobuild #extension #ecofriendlybuilding #grimsby #scunthorpe #grimsby

Day 2

The build reaches the 1st floor, concrete is booked for first thing in the morning to fill the insulated blocks. This will create a thermal mass within the walls.

#ICF #insulatedconcreteform #ecobuild #extension #ecofriendlybuilding #grimsby #scunthorpe #grimsby

Concrete pour

Concrete is pumped into the cavities of the blocks and the second floor blocks installed to wall plate level. 

#ICF #insulatedconcreteform #ecobuild #extension #ecofriendlybuilding #grimsby #scunthorpe #grimsby

Day 3

The team work together to ensure a smooth pour of concrete. 

#ICF #insulatedconcreteform #ecobuild #extension #ecofriendlybuilding #grimsby #scunthorpe #grimsby

Completion of walls

A full 2 story extension built in 3 days from damp to wall plate. Keeping the cost of labour to a minimum for our clients with an ECO friendly system.